Inside a Maxsen Installation: The Five Visits, from Plan to Handover

A Maxsen smart home is installed over five visits, from site planning and wiring checks to scene setup and handover, by in-house electricians with your ID.

By the Maxsen design team · Updated October 2026 · 5 min read

An electrician fitting a smart switch panel on a freshly painted wall in an HDB flat
Scene visualisationFitting a smart switch during renovation

A Maxsen smart home is installed over five visits, from site coordination and planning to final customisation and handover. Maxsen's own in-house electricians carry the project throughout, working alongside your interior designer and contractor, so wiring, lighting and finishes happen in the right order and you know what to decide at each step.

Key takeaways

  • The five visits are site coordination and planning, electrical inspection and lighting delivery, smart device installation, initial integration and scene setup, and final customisation and handover.
  • Switch positions, light positions and the rooms for the 1800K–6000K Tunable White upgrade are settled at the first visit, so book it before carpentry is finalised.
  • Wiring issues, such as a switch box without a neutral wire, are raised at the second visit, before anything is fitted.
  • In Singapore, electrical work at home must be carried out by an EMA Licensed Electrical Worker, and HDB makes flat owners responsible for ensuring this 12.
  • Your scenes are composed with you at handover, and every one can be tuned afterwards.

How does a Maxsen installation work?

It runs in five visits, each with a clear purpose, by one in-house team from start to finish. Here is what happens at each, and what you are asked to decide.

VisitWhat happensWhat you decide
1. Site coordination and planningEveryone meets on site to settle wiring, product placement and the installation planSwitch, panel and light positions; rooms for the Tunable White upgrade
2. Electrical inspection and lighting deliveryWiring is confirmed ready; lighting is deliveredAny changes raised by the inspection
3. Smart device installationSmart switches, control panels and connected devices are fittedVery little; the plan is in place
4. Initial integration and scene setupEverything joins one system; default scenes are set and the home is testedFirst impressions of the default scenes
5. Final customisation and handoverPersonal scenes are refined and the home is handed overScene names and levels that suit how you live

What happens at the first visit?

Visit one, site coordination and planning, is where the whole installation is decided. Maxsen meets everyone on site to settle wiring, product placement and the installation plan.

This is the moment to confirm where every switch, panel and light goes, and which rooms get the premium Tunable White upgrade. Bring your floor plan, your interior designer (ID) and a sense of how you use each room in the morning, at dinner and late at night. For BTO owners, it helps to have your ID's electrical layout to hand. See planning a smart home for your BTO.

What happens at the second visit?

Visit two, electrical inspection and lighting delivery, confirms the wiring is ready and brings your lighting on site.

If something needs attention, it is raised here, before anything is fitted. A common example is a switch box without a neutral wire, the return conductor that many smart switches rely on to stay powered when the light is off 3. See the no-neutral-wire question.

What happens at the third visit?

Visit three, smart device installation, is when the hardware goes in. Smart switches, control panels and every connected device are fitted.

That includes switches such as the Lusano+ Prestige, Lusano Noble and NOVA+ Pro, the Halo smart dimmer, your lighting, and the devices that bring curtains, fans and aircon into the system. Because the plan was settled at the first visit, there is little for you to decide on the day.

What happens at the fourth and fifth visits?

Visit four joins everything into one system; visit five refines it around you and hands the home over.

At visit four, initial integration and scene setup, default scenes are set and the home is tested room by room. A scene is a saved combination of light levels and colour temperatures that you recall with one press.

At visit five, final customisation and handover, your personal scenes are refined and the home is handed over. Scenes are composed with you, so names and levels suit how you actually live. Halo, for example, begins with five scenes: Morning, Gathering, Evening, Movie and Night, and each can be tuned. See Halo, explained and designing lighting scenes.

Who does the electrical work, and what do Singapore rules require?

Maxsen's own in-house electricians do the work. At the time of writing (October 2026), the Energy Market Authority (EMA) requires electrical work at homes to be carried out by a Licensed Electrical Worker (LEW), who also inspects and certifies the installation before power is turned on 1.

HDB's guidelines make flat owners responsible for supervising electrical work in their flat and ensuring it is done by an EMA-licensed contractor 2. For more on HDB rules, see HDB electrical works and smart home rules.

Why does Maxsen work this way?

Because one team, working in step with your designer, leaves less to chance.

  • One team, one responsibility: Maxsen's in-house electricians stay with your project. If anything comes up during installation, they handle it, so nothing waits on a third party.
  • In step with your designer: Maxsen works closely with your interior designer and contractor, so wiring, lighting and finishes happen in the right order.
  • Recommendations, not homework: you choose what you love from Maxsen's recommendations, and it is built to your liking.

Our honest advice

Book the first visit before your carpentry and false ceilings are finalised. Switch positions, ceiling coves and power for motorised curtains are easiest to get right while the electrical works are still being planned, and changing them afterwards means reopening finished work.

Before handover, live with the default scenes for a few evenings if you can. You will know far better which levels feel right at dinner and late at night.

Planning a smart home in Singapore? Maxsen plans, installs and hands over every home with its in-house team, over five visits.

FAQ

Do I need to be there at every visit?

The first and last visits matter most: planning, and choosing your scenes at handover.

Can Maxsen work with my existing contractor?

Yes. Maxsen's in-house electricians work alongside your interior designer and contractor throughout the five visits.

Can I change my scenes after handover?

Yes. Scenes are composed with you at handover, and every one can be tuned afterwards.

Who do I contact after the installation?

Call or WhatsApp +65 8761 6101 for sales and support. Our second sales line is +65 8988 1882.

Sources

  1. "Electrical Safety." Energy Market Authority. ema.gov.sg
  2. "Electrical Works." Housing & Development Board. hdb.gov.sg
  3. "DIY smart home: What's a neutral wire and what to do if you don't have one." Tom's Guide. tomsguide.com
Talk to us

Discover a smarter way to feel at home.

Tell us about your home. We will visit, listen, and propose a home composed in light.